  • MEP Design

In construction project of recent days Building Information Modeling (BIM) is extremely important. BIM services do not help to provide digital picture of building only but it also helps to add greater levels of collaboration and interoperability effectively between the different disciplines(architectural, civil, structural, mechanical and electrical). One another most important advantages of this technology against CAD is, it gives designers chance to implement more task by means of computer so that it decreases human based mistakes, waste of time and cost. More about BIM7D

Wellmechs is an established BIM modeling company offering efficient and affordable BIM 3D, 4D, 5D, 6D and 7D services to list of satisfied clients across the globe. Our Company technical staff with the qualified engineer and technical team, are ready to serve customers requests with their comprehensive experience on the international standards such as ASHRAE, NFPA, IPC and IEEE.

 

 

 

 

 

 

 

 

Company gives MEP CAD and BIM service to its MEP consultants, contractors and manufacturing firms. Our MEP design team with the engineer and technical staff are using Revit MEP, Dynamo (Python enhanced), Navisworks, AutoCAD MEP, Autocad P&ID, ANSYS Fluent programs professionally at their technical designs.

 

 

 

 

 

 

 

 

Service Offerings:

  • MEP Design with Revit BIM Modeling (3D)
  • Sustainable Building Design (Energy Analyzes)
  • Heating and Cooling Load Analyzes using RTS method
  • 3D BIM Models (Revit Arch, Structural, MEP, Plant)
  • HVAC Ducting 3D BIM Modeling
  • Fire Fighting Line 3D BIM Modeling
  • Electrical 3D BIM Modeling
  • Plumbing Lines 3D BIM Modeling
  • Overall Project Estimates
  • 4D BIM Model (3D + Time, i.e. Construct, Schedule)
  • 5D BIM Model (4D + Costing)
  • 6D BIM Model (Sustainability Optimization)
  • 7D BIM Model (Facilities and Asset Management)

 

Steps of MEP Design (Illustration with the Sample Project):

Sample Project: Neftcilər Mall, Baku / Azerbaijan

 

Preparing Model

Initially, model is prepared using Building Information Model technology according to architectural 2d (AutoCAD) drawings (See: Photo - 2).
Key information for this step are (as an input):

⋆ Type of project (Factory, Hospital, Hotel, Restaurant and etc.)

⋆ Material information (Walls, Windows, Glass, Door and etc.) and their technical parameters (heat conduction coefficient - k, Thickness, Thermal Density, SHGC of Glasses and etc.)

⋆ Coordinates and orientation of project

⋆ Description of rooms and spaces

 

Entering MEP information

Afterwards, to implement Energy Analyzes (Heating and Cooling Load Analyze) of model correctly, we are adding all below important information for each space and zone.

⋆ Outdoor Design Condition of location (Yearly minimum and maximum temperature, humidity and wind speed values).

⋆ Indoor Design Condition (Required temperature, humidity and outdoor air rate values)

⋆ Facility schedule values (daily and weekly occupancy schedule, lighting schedule and other equipment usage schedule)

 

Implementing Energy Analyzes

For the heating and cooling load analyze we are using latest ASHRAE technology RTS – Radiant Time Series (See: Photo - 3).

 

MEP Design

Finally, to meet required calculated heating and cooling loads we are choosing most proper MEP devices and systems. During MEP design we are considering ASHRAE (American Society of Heating, Refrigeration and Air Conditioning), SMACNA (Sheet Metal and Air Conditioning Contractors National Association), National Fire Protection Association (NFPA), IPC (International Plumbing Code) and IEEE (Institute of Electrical and Electronics Engineers) standards. All equipment, ventilation ducts, pipes, electric trays location and sizes will be prepared 3D and presented to Client. All design details will be clear for Client before proceeding to construction phase. For sample 3D presentation see Photo – 4.

To see our MEP Design REFERENCES (BIM7D)